Taylor & Nolan Counties Repower
770 Megawatts

Blattner Energy
Repowering Texas with Sustainability.
The project consisted of 291 existing turbines that were originally installed by Blattner Energy in 2005. The repower scope included the mechanical overhaul of the existing turbines including blades, hub, gear boxes, main shafts, main bearing assemblies, generator and generator frame.
Achievements: Continuous Improvement.
- Collaboration to develop improved means and methods for added value
- Delivering power within a functioning/energized wind farm



Energy equivalent to power 146,300 homes with clean energy.
How many turbines were installed?
146K
Homes Powered

15
Installations